4 tools
Concrete & Masonry calculators
Concrete & Masonry calculators: Estimate concrete, rebar, block and footing quantities for common construction projects.
Volume and labeled mix yield determine order quantities. Footing, reinforcement and structural requirements require the actual design and bearing information rather than a universal spacing or waste percentage.
Rebar Calculator
Order rebar by weight or length before tying a grid.
Inputs: Slab length, Slab width, Bar spacing, Bar size
Open calculator →02Concrete Block (CMU) Calculator
Order block and mortar together for a wall run.
Inputs: Wall length, Wall height
Open calculator →03Mortar Mix Calculator
Match mortar orders to the actual unit count and joint thickness.
Inputs: Brick or block count, Mortar per 100 units, Bag yield
Open calculator →04Footing Size Calculator
Use as a reference check before a stamped foundation design.
Inputs: Load per linear foot, Allowable soil bearing pressure
Open calculator →Concrete & Masonry calculator results and examples
| Calculator | What it answers | Headline output | Worked example |
|---|---|---|---|
| Rebar Calculator | Order rebar by weight or length before tying a grid. | Total rebar length (feet) | 220 |
| Concrete Block (CMU) Calculator | Order block and mortar together for a wall run. | Blocks needed | 180 |
| Mortar Mix Calculator | Match mortar orders to the actual unit count and joint thickness. | Mortar volume needed (cu ft) | 15 |
| Footing Size Calculator | Use as a reference check before a stamped foundation design. | Required footing width (inches) | 16 |
Where people go wrong with concrete & masonry numbers
A 100 ft² face divided by the nominal 8-by-16-inch module area gives 112.5 modules before openings, cuts or breakage. Actual unit dimensions and joint layout need separate checks.
Concrete & Masonry: related calculator categories
Common concrete & masonry questions
Why should I round concrete orders up instead of ordering the exact calculated volume?
Slab thickness and subgrade are never perfectly uniform, and any spillage or over-excavation increases the volume actually poured. Running short mid-pour on ready-mix concrete is a much more expensive problem than having a small amount left over, since a cold joint can weaken the slab
What determines how much rebar spacing a slab needs?
Spacing depends on the expected load, slab thickness and the local code or engineering specification, not a single universal rule. A driveway slab and a structural footing carrying building loads call for very different spacing and bar sizes, so a project-specific spec should always override a generic default
Why is soil bearing capacity assumed rather than measured in a footing estimate?
Presumptive soil bearing values published in the building code are conservative defaults meant for preliminary planning, not a substitute for an actual site evaluation. Real soil varies significantly by composition, moisture and compaction, and a geotechnical report gives a site-specific value instead of a generic assumption
How is a concrete block wall's mortar amount estimated?
It's typically estimated from the total block count using a published coverage rule, roughly one bag of mortar mix per 25 to 30 standard blocks, rather than calculated joint by joint, since mortar joint thickness and tooling waste are hard to predict precisely before the job starts
Why do 60 lb and 80 lb bags of concrete mix have different yields per pound?
Both are the same basic mix, so the cubic-foot yield scales closely with bag weight, but published yields differ slightly between manufacturers and product lines. Always check the yield printed on the specific bag you're buying rather than assuming every bag of a given weight yields the same volume
Does a thicker slab need proportionally more rebar?
Not necessarily. Rebar spacing in a slab is typically driven by the expected load and control-joint spacing more than by thickness alone, so a thicker slab under light residential load may use the same reinforcing grid as a thinner one under the same load
Why does concrete cure differently in hot and cold weather?
Curing is a chemical hydration reaction that speeds up in heat and slows in cold, and extreme temperatures in either direction can weaken the final strength if not managed. Hot-weather pours often need extra water management to avoid rapid surface drying, while cold-weather pours may need insulation or heating to cure properly
Is a CMU block wall load-bearing by default?
Not automatically, whether a block wall is load-bearing depends on the structural design, and load-bearing block walls typically require grouted and reinforced cells at specified intervals that a purely partition wall does not. Confirm the wall's structural role before assuming a simple block-count estimate covers reinforcement needs too
How many bags of concrete do I need for a slab?
An assumed 10-by-10-foot slab at four-inch thickness has 100/3 cubic feet, or about 1.23457 cubic yards, before allowance. Divide by the actual product’s stated mixed yield per bag and round up. Bag weight alone does not establish yield for every mix.
How far apart should rebar be spaced?
Use the project’s engineering specification and adopted requirements for bar size, spacing, cover, laps and support. Slab purpose, loads and ground conditions matter. A quantity grid can estimate material from a design, but cannot select reinforcement merely from a generic residential spacing.
How many concrete blocks do I need for a wall?
About 1.125 standard 8 by 16 inch blocks per square foot of wall, after subtracting openings and adding a few percent for breakage