Portfolio Weighted Return: formula
OpenStax Principles of Finance: risk and return to multiple assets
Portfolio Weighted Return: worked example
| Asset A weight | 50.0% |
|---|---|
| Asset A return | 8.0% |
| Asset B weight | 30.0% |
| Asset B return | 5.0% |
| Asset C weight | 20.0% |
| Asset C return | 2.0% |
| Weighted portfolio return | 5.9% |
| Total entered weight | 100.0% |
| Unallocated or excess weight | 0.000% |
It is a weighted average of assumptions, and the assumptions are the weak point: expected returns are uncertain and differ widely between sources. The result ignores rebalancing, taxes and fees at the portfolio level, and assumes weights stay fixed. Realized return will differ as weights drift.
Portfolio Weighted Return: changing Asset A weight
| Asset A weight | Weighted portfolio return | Total entered weight | Unallocated or excess weight |
|---|---|---|---|
| 46.0% | 5.6% | 96.0% | 4.0% |
| 48.0% | 5.7% | 98.0% | 2.0% |
| 50.0% (example) | 5.9% | 100.0% | 0.000% |
| 52.0% | 6.1% | 102.0% | -2.0% |
| 54.0% | 6.2% | 104.0% | -4.0% |
Portfolio Weighted Return: compare input ranges
| Input | Tested from | To | Weighted portfolio return: low input | Weighted portfolio return: high input | Swing |
|---|---|---|---|---|---|
| Asset A return | 6.0% | 10.0% | 4.9% | 6.9% | 2.0% (34%) |
| Asset B return | 4.0% | 6.0% | 5.6% | 6.2% | 0.600% (10%) |
| Asset C return | 1.0% | 3.0% | 5.7% | 6.1% | 0.400% (6.8%) |
| Asset A weight | 48.0% | 52.0% | 5.7% | 6.1% | 0.320% (5.4%) |
| Asset B weight | 28.0% | 32.0% | 5.8% | 6.0% | 0.200% (3.4%) |
| Asset C weight | 18.0% | 22.0% | 5.9% | 5.9% | 0.080% (1.4%) |
Portfolio Weighted Return: individual input comparisons
| Input | Value | Weighted portfolio return | Total entered weight | Unallocated or excess weight |
|---|---|---|---|---|
| Asset A weight | 46.0% | 5.6% | 96.0% | 4.0% |
| 48.0% | 5.7% | 98.0% | 2.0% | |
| 50.0% | 5.9% | 100.0% | 0.000% | |
| 52.0% | 6.1% | 102.0% | -2.0% | |
| 54.0% | 6.2% | 104.0% | -4.0% | |
| Asset A return | 4.0% | 3.9% | 100.0% | 0.000% |
| 6.0% | 4.9% | 100.0% | 0.000% | |
| 8.0% | 5.9% | 100.0% | 0.000% | |
| 10.0% | 6.9% | 100.0% | 0.000% | |
| 12.0% | 7.9% | 100.0% | 0.000% | |
| Asset B weight | 26.0% | 5.7% | 96.0% | 4.0% |
| 28.0% | 5.8% | 98.0% | 2.0% | |
| 30.0% | 5.9% | 100.0% | 0.000% | |
| 32.0% | 6.0% | 102.0% | -2.0% | |
| 34.0% | 6.1% | 104.0% | -4.0% | |
| Asset B return | 3.0% | 5.3% | 100.0% | 0.000% |
| 4.0% | 5.6% | 100.0% | 0.000% | |
| 5.0% | 5.9% | 100.0% | 0.000% | |
| 6.0% | 6.2% | 100.0% | 0.000% | |
| 7.0% | 6.5% | 100.0% | 0.000% | |
| Asset C weight | 16.0% | 5.8% | 96.0% | 4.0% |
| 18.0% | 5.9% | 98.0% | 2.0% | |
| 20.0% | 5.9% | 100.0% | 0.000% | |
| 22.0% | 5.9% | 102.0% | -2.0% | |
| 24.0% | 6.0% | 104.0% | -4.0% | |
| Asset C return | 0.000% | 5.5% | 100.0% | 0.000% |
| 1.0% | 5.7% | 100.0% | 0.000% | |
| 2.0% | 5.9% | 100.0% | 0.000% | |
| 3.0% | 6.1% | 100.0% | 0.000% | |
| 4.0% | 6.3% | 100.0% | 0.000% |
Portfolio Weighted Return: combined input changes
| Asset A weight / Asset A return | 4.0% | 8.0% | 12.0% |
|---|---|---|---|
| 46.0% | 3.7% | 5.6% | 7.4% |
| 48.0% | 3.8% | 5.7% | 7.7% |
| 50.0% | 3.9% | 5.9% | 7.9% |
| 52.0% | 4.0% | 6.1% | 8.1% |
| 54.0% | 4.1% | 6.2% | 8.4% |
Portfolio Weighted Return: which assumptions move the result?
Portfolio Weighted Return: values and definitions
| Quantity and definition | Value used |
|---|---|
| Asset A weight | 50.0% |
| Asset A return | 8.0% |
| Asset B weight | 30.0% |
| Asset B return | 5.0% |
| Asset C weight | 20.0% |
| Asset C return | 2.0% |
| Weighted portfolio return | 5.9% |
| Total entered weight | 100.0% |
| Unallocated or excess weight | 0.000% |
Portfolio Weighted Return: half and double Asset A return
| Asset A return | Weighted portfolio return |
|---|---|
| 4.0% | 3.9% |
| 8.0% | 5.9% |
| 16.0% | 9.9% |
Enter each asset's weight as a percentage of the portfolio and the expected or historical return for that asset. Weights should add to 100, and the tool reports any unallocated or excess weight. Use consistent return assumptions across assets, such as long-run expected returns after fees.
Historical returns from a fund page are the usual starting point.
Common error: Entering asset weights that don't sum to 100%, whether from a rounding habit or forgetting a position. The calculated expected return then describes a portfolio that doesn't match the one being modeled.
Investing & Returns calculators: Two-Asset Portfolio Risk Calculator, Investment Withdrawal Calculator, Stock Split Calculator, Crypto Profit Calculator, P/E Ratio Calculator, PEG Ratio Calculator.
A portfolio's expected return only reflects reality when the entered weights sum to the whole portfolio, since an expected return calculated against weights that don't total 100% is answering a question about a different, incomplete portfolio than the one being modeled.
Add up all three entered weights before trusting the result. They should total 100%; anything else means part of the portfolio isn't being represented in the calculation.
The two-asset portfolio risk calculator shows the volatility side, and the asset allocation drift page shows how weights change over time. For a goal, the future value calculator turns the expected return into an ending balance. Compare the mix against a simple target-date fund.
How do I choose expected returns?
Use long-run estimates for each asset class from a credible source, or historical averages, and prefer a range of lower and higher cases over a single figure.
Does a higher weighted return mean a better portfolio?
Not by itself. The weighted return does not measure portfolio risk. Co-movement, dispersion and concentration require separate analysis.
What if my weights do not add to 100%?
The tool reports the unallocated or excess weight. Adjust the inputs until they total 100 so the result describes the whole portfolio.