Inventory Reorder Point Calculator

The reorder point combines modeled lead-time demand with the selected buffer. Variable demand, lead time or a misspecified buffer can still cause a stockout. About 33 units sell each day, lead time demand is about 460 units, and adding 500 units of safety stock gives a reorder point of 960.

Setting it too low risks stockouts, and too high ties up cash. Review it when demand or lead times change.

Inventory Reorder Point Calculator: inputs

Calculated result
Reorder point960.3
Average daily demand32.9
Lead-time demand before safety stock460.3

Inventory Reorder Point Calculator: Annual unit demand sensitivity

Inventory Reorder Point Calculator: Annual unit demand and Reorder point5 calculations vary the “Annual unit demand” input while holding the other entered inputs constant.9,600868.210,800914.212,000960.313,2001,006.314,4001,052.3

Inventory Reorder Point: worked example

Annual unit demand12,000
Supplier lead time14.0 days
Safety stock500
Reorder point960.3
Average daily demand32.9
Lead-time demand before safety stock460.3

Inventory Reorder Point: formula

Reorder point = average daily demand × lead time + safety stock

NC State: reorder point formula

Common error: Assuming that half of observations must exceed their arithmetic mean. That statement describes neither skewed demand nor irregular lead times. Safety stock needs a chosen service objective and measured variability, not that assumption.

Annual unit demand divided by 365 gives average daily demand. Supplier lead time is the number of days between placing an order and having it on the shelf, using the realistic figure rather than the quoted one, since delays are common. Safety stock is the extra inventory kept for demand or lead-time surprises; it can come from the safety stock calculator or from experience.

Use consistent units for demand and lead time.

Inventory Reorder Point: changing Annual unit demand

Annual unit demandReorder pointAverage daily demandLead-time demand before safety stock
9,600868.226.3368.2
10,800914.229.6414.2
12,000 (example)960.332.9460.3
13,2001,006.336.2506.3
14,4001,052.339.5552.3

Inventory Reorder Point: compare input ranges

InputTested fromToReorder point: low inputReorder point: high inputSwing
Safety stock450550910.31,010.3100 (10%)
Annual unit demand10,80013,200914.21,006.392.1 (9.6%)
Supplier lead time13.0 days15.0 days927.4993.265.8 (6.8%)

Inventory Reorder Point: individual input comparisons

InputValueReorder pointAverage daily demandLead-time demand before safety stock
Annual unit demand9,600868.226.3368.2
10,800914.229.6414.2
12,000960.332.9460.3
13,2001,006.336.2506.3
14,4001,052.339.5552.3
Supplier lead time11.0 days861.632.9361.6
13.0 days927.432.9427.4
14.0 days960.332.9460.3
15.0 days993.232.9493.2
17.0 days1,058.932.9558.9
Safety stock400860.332.9460.3
450910.332.9460.3
500960.332.9460.3
5501,010.332.9460.3
6001,060.332.9460.3

Inventory Reorder Point: combined input changes

Annual unit demand / Supplier lead time11.0 days14.0 days17.0 days
9,600789.3868.2947.1
10,800825.5914.21,003
12,000861.6960.31,058.9
13,200897.81,006.31,114.8
14,4009341,052.31,170.7

Inventory Reorder Point: which assumptions move the result?

Inventory Reorder Point: Reorder point as Safety stock changesReorder point starts at 860.3. Moving Safety stock from 400 to 600 changes it to 1,060.3, with Annual unit demand 12,000; Supplier lead time 14.0 days kept fixed.400860.3450910.3500960.35501,010.36001,060.3
Chart quantityDisplayed settings
Safety stock400 → 600
Reorder point860.3 → 1,060.3
Annual unit demand12,000
Supplier lead time14.0 days
Inventory Reorder Point: Reorder point as Annual unit demand changesReorder point starts at 868.2. Moving Annual unit demand from 9,600 to 14,400 changes it to 1,052.3, with Supplier lead time 14.0 days; Safety stock 500 kept fixed.9,600868.210,800914.212,000960.313,2001,006.314,4001,052.3
Chart quantityDisplayed settings
Annual unit demand9,600 → 14,400
Reorder point868.2 → 1,052.3
Supplier lead time14.0 days
Safety stock500

Inventory Reorder Point: values and definitions

Quantity and definitionValue used
Annual unit demand12,000
Supplier lead time14.0 days
Safety stock500
Reorder point960.3
Average daily demand32.9
Lead-time demand before safety stock460.3

Inventory Reorder Point: half and double Safety stock

Safety stockReorder point
250710.3
500960.3
1,0001,460.3

The calculation assumes steady demand, so seasonal or promotional spikes need a higher point at those times. Supplier reliability changes lead time, and a longer delay raises the required stock. It does not decide the order quantity, which is the economic order quantity's role.

Items with lumpy demand need a different approach.

Business Finance calculators: Inventory Carrying Cost Calculator, Target Price and Margin Calculator, Pallet / Box Loading Calculator, Straight-Line Depreciation Calculator, Double Declining Balance Depreciation Calculator, GDP Calculator.

A reorder point set from average demand alone runs out during any month that's busier than average, because the point is supposed to cover demand during the lead time it takes a new order to arrive. Average demand times average lead time leaves no room at all for a demand spike or a delayed shipment during that exposed window.

Confirm the safety-stock component reflects your actual demand variability and supplier reliability, not just a padded guess, since that's the piece doing the real protective work.

Set the order size with the economic order quantity calculator, and derive the safety stock from a service level with the safety stock calculator. The inventory turnover and carrying cost pages show the cost of holding more. Review slow-moving items separately.

What is a reorder point?

The inventory level that triggers a new order, equal to the demand expected during the supplier's lead time plus safety stock.

What happens if lead time doubles?

Lead-time demand doubles, so the reorder point rises sharply. Track supplier performance and update the figure when delivery times change.

Why include safety stock?

It protects against demand higher than average or deliveries later than promised, which would otherwise cause stockouts.